Stainless steel wire-wrapped screens, casing, tail pipes, drill bits and more
Well depth and formation parameters
Quality traceability
Ex-stock supply
01 / FLUID END & COMPONENTS
Cementing pumps (SPM TWS 600S HD, GD 600, GD 1000Q HD)
Fracturing pumps (GD 2250T, GD 2500Q HDF, GD 3000)
Pump make/model · plunger size or drawing
02 / WATER WELL COMPLETION
A matched completion package, configured from your well conditions.
We turn project inputs into a reviewed technical BOM covering screens, casing, tail pipes, GRE slotted liners and specified accessories. Final well design remains subject to customer or qualified designer approval.
- 01
Collect
Well geometry, aquifer data, target yield, water chemistry and design standard.
- 02
Configure
Screen intervals, slot selection, casing, connections, accessories and documentation.
- 03
Deliver
Reviewed BOM, drawings/data sheets, inspection records and sequenced packaging.

DEZHOU MANUFACTURING BASEQUALITY ASSURANCE
Quality you can verify, from production through delivery.
From materials and critical dimensions to project-specific inspection and packing, we apply the agreed quality controls and provide supporting records for confident receiving.
U.S. FULFILLMENT SUPPORT
Local dispatch for confirmed stocked items.
Selected SKUs may be stocked in and shipped from our U.S. warehouse. Custom assemblies and project products follow the confirmed production and delivery plan.
START WITH THE RIGHT DATA
Send the parameters. Receive a scoped response.
Choose the inquiry path that matches your project. The form captures the technical information needed for an initial review and routes it to the responsible sales contact.